Wendy B. Reid

The Rancho Seco oral histories document the story of the, now closed, Rancho Seco Nuclear Power Plant located in Ione, California. The oral histories present a broad range of perspectives and attitudes. Issues included plant safety; environmental concerns; down time due to technical problems resulting in increased cost to SMUD users; organizational structure and relationship of managers, staff and contractors; closed board meetings; and plant operations that were eventually closed down by voters. Wendy B. Reid was a project manager for the California Energy Commission, an energy consultant for the Sacramento League of Women Voters, and the director for Ward Four at SMUD.




Date of Interview

Interviewer

1995-04-04

Robert E. Hull

Project

Program/Repository

Rancho Seco Nuclear Power Plant Oral History Project

Use Policy

Copyrighted. Rights are owned by California State University, Sacramento. University Library. Transmission or reproduction of materials protected by copyright beyond that allowed by fair use requires the written permission of the Copyright Holder. In addition, the reproduction of some materials may be restricted by terms of gift or purchase agreements, donor restrictions, privacy and publicity rights, licensing and trademarks. Works not in the public domain cannot be commercially exploited without permission of the copyright owner. Responsibility for any use rests exclusively with the user.

View of the Rancho Seco Nuclear Power Plant cooling towers, seen through tree branches.
Courtesy of the Center for Sacramento History

Just practically, it didn’t make sense to me how you were going to dispose, monitor, assure the safety of waste with the kind of safety implications that radioactive waste has for the length of time that that waste was going to be potentially dangerous.